This figure is deceptive, however, because concrete walls now line the banks of all Japan's rivers and streams; in addition, countless diversion canals have brought the total of river works to the tens of thousands. The Construction Ministry justifies the dams and canals on the pretext that Japan faces a water shortage. Yet it is a well-known fact that this is not true. The River Bureau uses projections for population and industrial growth that were calculated in the 1950s and never revised, despite drastic changes in the structure of water use since then. The estimates are so far out of line that, according to Sankei Shimbun newspaper, the additional demand projected by the River Bureau is 80 percent above and beyond all the water used in Japan in 1995.

An example of the construction bureaucracy's modus operandi is the Nagara Dam, an enormous facility spanning the Nagara River, where three river systems meet in Mie, Gifu, and Aichi prefectures. The cost of this facility (¥1.5 trillion, roughly $12 billion) makes it one of the world's most expensive civil-engineering projects. The Kozo, or «concept,» of the dam took shape in 1960, but while water needs changed completely in the ensuing decades, the plan did not, for too many bureaucrats and politicians stood to gain from the construction money. By 1979, new water-use projections showed that the three prefectures would have more water than they needed for at least thirteen to twenty years – possibly forever.

The governor of Mie, well aware of the water surplus, was concerned about the tremendous expense that his prefecture would have to shoulder. At the same time, he was afraid to cancel the project because the Ministry of International Trade and Industry (MITI) was subsidizing its construction, and if the prefecture turned down the dam MITI would deny it money in the future. In 1979, Mie dispatched Takeuchi Gen'ichi, the director of its Office of Planning, to present the new figures to MITI and to beg for a delay in construction. But MITI's manager of the Office of Industrial Water Use dismissed Takeuchi, saying, «You can't just tell us now that there will be too much water!» MITI couldn't allow the fact of water surplus in 1979 to interfere with the inexorable concept adopted in 1960. Environmental groups loudly protested the damming of Japan's last major river in its natural state, but their voices went unheard. Construction began in the 1980s, and today the central dam stands complete while work goes forward on a vast web of canals and subsidiary flood works spanning the three rivers.

Once a concept, always a concept. As in the case of the Isahaya wetlands, no opposition and no change in outward realities would affect the concept.

|< Пред. 17 18 19 20 21 След. >|

Java книги

Контакты: [email protected]